Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

To edit a deliverablean existing deliverable, click on Deliverables (1), which will open the Deliverable of Output section.

Image Removed

Once in here, then move the “Deliverables” (2.5) box of a specific output. Under the “Actions” column of the output table .

Image Added

Once the new window opens (2.5), move the cursor to the Actions column beside the deliverable you want to edit and click on Edit (2).Image Removed“Actions” column and then on the on the “Edit” (2.5.2) box corresponding to the deliverable to be edited.

Image Added

By clicking on “Edit” another window opens (2.5.2) in which the “Information” (a) and “CRP mapping” (b) sections can be edited.

Find a step-by-step guide for these section at the page “Add New Project Deliverable”.

Image Added

Once the edit is complete, press on Save Changesclick on “Save Changes”.

Remember that all the fields with asterisk are mandatory.